TONGXING COMMERCIAL HVAC PROJECT BRIEF Version: 2026-09-13 Reference: https://shangfenghvac.com/project-supply HOW TO USE Complete what is known. Mark unfinished items as "to be confirmed". Complete only the equipment sections relevant to your project. This worksheet organises an inquiry; it is not an equipment selection or design. Paste the key requirements into https://shangfenghvac.com/contact. List available drawings in your inquiry; our team can discuss how to share them. 1. PROJECT AND BUYER Project name or internal reference: Equipment installation country / region: Purchasing company country / region: Company and contact name: Work email: Purchasing role (contractor / importer / owner / consultant / other): Building or facility use: Project stage (planning / design / tender / purchase / replacement): Equipment types and quantities: Required purchase or delivery date: Equipment budget amount, if known: Budget currency: Budget basis: equipment supply only; exclude building and installation costs. 2. COMMON SELECTION AND SUPPLY INPUTS Available voltage / phase / frequency: Design outdoor conditions and required operating range: Operating hours and continuity requirements: Installation location, access and service-space constraints: Required technical or market documents for the quoted models: Required controls, alarms and building-management interfaces: Accessories requested from the equipment supplier: Items supplied by the local contractor or other vendors: Delivery location and requested delivery scope: Outstanding design questions: 3. CHILLER SECTION Application (comfort cooling / process / other): Design cooling duty and units: Design heating duty, if applicable, and units: Entering / leaving water temperatures and units: Design flow and units: Fluid type and glycol concentration, if applicable: Expected load profile and low-load operation: Proposed number of modules: Capacity required with a module unavailable, if specified: Existing pumps, tank, controls and water connections: Preferred catalogue model, if any: Available equipment schedule, hydraulic drawing or selection report: 4. ROOFTOP UNIT SECTION New installation or replacement: Existing unit model and nameplate information: Cooling and heating duties and units: Required supply airflow and units: Required external static pressure and units: Supply / return discharge arrangement: Ventilation, filtration and return / exhaust requirements: Curb dimensions and supply / return opening drawings available: Adapter or curb-work scope to be confirmed: Existing controls and connection requirements: Target changeover window and local contractor: 5. VRF SECTION Number of apartments / rooms / zones: Room-by-room cooling and heating load schedule available: Design winter and summer temperatures: Preferred indoor-unit types and quantities: Proposed outdoor-unit locations: Piping routes, lengths and height differences available: Indoor / outdoor grouping or selection report available: Separate ventilation equipment and scope: Room controls, central management and monitoring requirements: Required destination documents and local engineering checks: 6. PRECISION AIR-CONDITIONING SECTION Facility type (data hall / server room / edge / other): Current and future sensible heat loads and units: Design entering-air conditions: Room / rack layout and supply / return airflow arrangement: Airflow and pressure conditions at the equipment interface: Preferred arrangement (DX / chilled water / to be confirmed): DX heat rejection and route information, if applicable: Chilled-water temperatures and flow, if applicable: Operating duty and required capacity during maintenance or outage: Alarm, monitoring, restart and unit-coordination requirements: Other cooling systems and the remaining room-air cooling duty: Equipment and site interfaces handled by other parties: 7. INSTALLATION, COMMISSIONING AND SERVICE Local installation and service company (appointed / selecting / unarranged): Local engineer or technical contact: Who will handle commissioning and ongoing service: Remote support requested from Tongxing: On-site support requested, if needed (scope and timing to be agreed): Spare-parts and warranty questions for the quotation: Available documents (equipment schedule / drawings / specification / other): 8. ITEMS TO CONFIRM BEFORE AN ORDER Exact model schedule and configuration: Performance selection and stated conditions: Electrical and outline / connection drawings: Included accessories and excluded site work: Required model-specific documents and their availability: Delivery terms, technical support and service responsibilities: Unresolved questions and responsible parties: Next step: https://shangfenghvac.com/contact