A project equipment proposal should identify what is being supplied and the conditions used for selection. Use this checklist with your supplier and local engineering team to agree which documents are required, which are available, and what remains to be confirmed. Document requirements vary by equipment and destination.
1. Exact equipment and configuration
Request the complete model schedule, quantities, version of the technical sheet, included accessories and optional items. Check that the equipment description in the quotation matches the selected configuration. A catalogue title or nominal capacity is not a substitute for the model schedule.
2. Performance at the project conditions
Ask for the operating conditions used in the selection and compare them with the project brief. For chillers, review the cooling duty, water temperatures and design outdoor conditions. For rooftop units, include airflow and external static pressure. For VRF, review the proposed outdoor and indoor equipment combination and the installation information needed for that series.
3. Electrical and physical interfaces
Confirm voltage, phase, frequency and the applicable electrical data. Request outline and connection drawings for the quoted model. Ask the local engineer to check the installation footprint, access route, service clearances and the water, ductwork or refrigerant connections that apply to the equipment.
4. Controls and continuity requirements
Identify required controls, monitoring and building-management interfaces. If the project needs standby equipment or coordinated operation, state the intended arrangement and ask how the selected equipment will interface with the rest of the system. Record any items that must be supplied or configured by the local integrator.
5. Documents for the destination
Specify the documents required by the project and its destination. Ask which manufacturer, models and configurations each supporting document covers. Resolve any mismatch between the quoted model and the document before ordering; general catalogue logos alone do not establish coverage for a specific unit.
6. Installation, commissioning and service
Identify the team responsible for site installation, commissioning and ongoing service. Agree the installation instructions, available technical support, spare-parts arrangements and warranty terms for the selected equipment. Where a supplier site visit is needed, confirm its scope, timing and costs in the project arrangements.
7. Freeze the purchasing scope
Keep a dated equipment schedule, agreed document list and record of outstanding questions alongside the quotation. Compare suppliers against the same duty, configuration and delivery scope. Keep the equipment budget separate from building work and site installation costs.
Discuss your equipment requirements
Share the project country, equipment schedule if available, procurement stage and local engineering arrangements with Tongxing. The team can discuss the applicable equipment, available documents and information needed before selection and quotation.
Move from planning to an equipment brief.
- Air-Cooled Chiller Selection: A Project Buyer’s Guide
- Rooftop Unit Replacement: What to Check Before Ordering
- VRF for Apartment Buildings: Equipment Procurement Guide
- Precision Air Conditioning for Data Centres: RFQ Checklist
- Equipment supply and technical support